Vail Marriott in Lionshead Village announces $25M renovation

Published on : Saturday, December 29, 2018

The Vail Marriott Mountain Resort has launched an approximately $25 million renovation this summer. Work includes changes to guest rooms and meeting spaces.

 

The work is expected to be finished by the 2018 to2019 ski season.

 

General Manager Jonathan Brownlee said that With this extensive reimagination, the brand is are looking to infuse Vail’s charm throughout the resort and truly connect guests with the destination and the designers have captured the perfect Vail vacation vibe.

 

The redesign by the Simeone Deary Design Group was inspired by Swiss Chalet architecture and small European towns.

 

Contemporary rustic architecture with accents of modern mid-century pieces will take center stage. Guest room bathrooms will feature upgraded finishes, including gray rift-cut oak vanities with green marble counter tops and matte black metal accents, porcelain tile floors and walls, and polished chrome hardware.

 

With the rooms being introduced this summer and finalized in September 2018, the entire first phase of the renovation will debut with the launch of the redesigned Grand Ballroom, Grand Foyer and Colorado Ballroom totaling 25,000 square feet of meeting space. This will include a new outdoor veranda featuring a bar, fire features and private settees.

Tags: , , ,

Comments are closed.

arrow2Follow Us
 
facebook-logo  twitter-logo  LinkedIn_logo  youtube-logo   rss_logo 

ADVERTISEMENT

    TRAVEL INDUSTRY EVENTS

    More Events...